Coryneform bacterium transformant with improved aniline productivity and process for producing aniline using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803223
SERIAL NO

14782893

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An objective of the present invention is to provide a microorganism capable of efficiently producing aniline from aminobenzoic acid, and a process for efficiently producing aniline from aminobenzoic acid. To achieve the objective, provided is an aniline-producing transformant constructed by introducing a gene which encodes an enzyme having aminobenzoate decarboxylase activity into a coryneform bacterium as a host, characterized in that the enzyme having aminobenzoate decarboxylase activity is composed of an amino acid sequence which is the same as that represented by SEQ ID NO: 2 except for having a mutation of at least proline (P) at position 309 from the N terminus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTD3-6-9 WAKINOHAMA-CHO CHUO-KU KOBE 651-0072
RESEARCH INSTITUTE OF INNOVATIVE TECHNOLOGY FOR THE EARTH9-2 KIZUGAWADAI KIZUGAWA-SHI KYOTO 6190292

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujikura, Keitarou Hyogo, JP 5 14
Hiraga, Kazumi Kyoto, JP 12 9
Inui, Masayuki Kyoto, JP 52 211
Yukawa, Hideaki Kyoto, JP 53 281

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00