Blow molding method, blow mold, and blow-molded container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802729
SERIAL NO

14380498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blow molding method includes a primary blow molding step that molds a preform (200) in a primary blow mold (300A) that includes a primary temperature control section (330) to obtain an intermediate molded article (202), a shrinkage step that discharges blow air from the intermediate molded article to shrink the intermediate molded article, and a secondary blow molding step that blow-molds the intermediate molded article (204) that has shrunken in a secondary blow mold that includes a secondary temperature control section (430) to obtain a final molded article. The primary blow molding step cools a first intermediate molding region of the intermediate molded article that follows a neck using a first primary temperature control section, and the shrinkage step shrinks a second intermediate molding region of the intermediate molded article of which the temperature is controlled by a second primary temperature control section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSEI ASB MACHINE CO LTDNAGANO PREFECTURE JAPAN NAGANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsuchiya, Yoichi Komoro, JP 68 569
Tsukamoto, Hiroyuki Komoro, JP 74 503
Usami, Masayuki Komoro, JP 33 299
Yokobayashi, Kazuyuki Komoro, JP 29 288

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00