Working machine for operating as an auxiliary power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802559
SERIAL NO

14165862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A working machine includes a combustion engine (101), an electromechanical power transmission chain (102) between the combustion engine and one or more actuators (109) of the working machine, an electrical connector system (103) for connecting to an external electrical power network (110), and an electronic power converter (104) for transferring electrical energy from the electromechanical power transmission chain to the external electrical power network and from the external electrical power network to the electromechanical power transmission chain. The working machine can be used as an auxiliary power plant for increasing reliability and capacity of power supply. On the other hand, the working machine can be energized merely by the external electrical power network when the capacity of the electrical power network is sufficient and when it is more cost-effective to use the electrical power network than to use the combustion engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DANFOSS A/SNORDBORG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naumanen, Ville Lappeenranta, FI 6 13
Rauma, Kimmo Lappeenranta, FI 10 29
Tarkiainen, Antti Lappeenranta, FI 18 95
Tiainen, Risto Pulp, FI 8 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00