Apparatus and method for sintering proppants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9801266
SERIAL NO

15601122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and method sinters or partially sinters green pellets in a selected temperature range to make proppant particles as the green pellets pass between an electrical arc and a gas flowing in the vortex path and exit an underflow of a vessel. The vessel has an overflow disposed in a first end, an underflow disposed in a second end, a middle portion having a circular cross-section disposed between the first end and the second end, and a tangential inlet proximate to the first end such that a gas from the tangential inlet flows along a vortex path from the first end to the second end of the vessel. A first electrode extends through the overflow and a second electrode extends through the underflow. The electrodes are used to create the open electrical arc. One or more feed tubes extend through the overflow proximate to the first electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORET PLASMA LABS LLC3500 TANGLE BRUSH DR #110 THE WOODLANDS TX 77381

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foret, Todd The Woodlands, US 73 1908

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00