Video recording system switchable between different recording frame rates, and method for controlling a video recording system to switch between different recording frame rates

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800770
SERIAL NO

15153016

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A video recording system includes an input unit and a video recording unit. The input unit generates a first operation signal upon receipt of a first trigger, and generates a second operation signal upon receipt of a second trigger. The video recording unit initiates operation in a first recording mode and records at a first frame rate in the first recording mode upon receipt of the first operation signal, and switches operation into a second recording mode and records in the second recording mode at a second frame rate that is different from the first frame rate upon receipt of the second operation signal when the video recording unit operates in the first recording mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANS ELECTRIC CO LTDNO 771 SEC 2 CHUNGSAN ROAD HUATANG TOWNSHIP CHANGHUA COUNTY 50353

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tung, Wei-Shin Changhua, TW 9 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00