Roof attachment assembly for solar panels and installation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800199
SERIAL NO

14946569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a roof attachment assembly for mounting a solar panel on a roof without the use of rails. The assembly includes a flashing member, a pivot bracket member, a clamp member, an array skirt and a splice member. The flashing member anchors the roof attachment assembly to the roof. The pivot bracket member is rotatably connected to the flashing member. The clamp member is connected to the pivot bracket member and is rotatably connected thereto. The clamp member includes grounding elements for electrically grounding the solar panel. The array skirt is removably connected to the clamp member. The splice member includes grounding elements for electrically grounding the solar panel and is removably connected to the array skirt. Also disclosed is a method of using the assembly and an assembly kit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IRONRIDGE, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ash, Jon Phoenix, US 46 744
Kim, William San Mateo, US 13 196
Meine, Shawn Phoenix, US 39 696
Pereira, William Phoenix, US 7 71
Taggart, David San Carlos, US 24 769

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00