DC-DC converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800155
SERIAL NO

15314988

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A DC-DC converter includes a control unit. When switching from an increasing operation to a first operation, the control unit increases an on time in the increasing switch at a beginning of the first operation longer than an end of the increasing operation. When switching from the first operation to the increasing operation, the control unit decreases the on time in the increasing switch at a beginning of the increasing operation shorter than an end of the first operation. When switching from the second operation to the decreasing operation, the control unit decreases an off time in the decreasing switch at a beginning of the decreasing operation shorter than an end of the second operation. When switching from the decreasing operation to the second operation, the control unit increases the off time in the decreasing switch at a beginning of the second operation longer than an end of the decreasing operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Onishi, Masanori Kariya, JP 17 911

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00