Rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800106
APP PUB NO 20170063185A1
SERIAL NO

15122476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Satisfactory magnet torque is achieved while avoiding a reduction in the reluctance torque generated. The rotor core is provided with a plurality of magnet slots arranged in the circumferential direction of the rotor core and a gap formed of base holes and a projecting hole. The base holes extend from both ends in the circumferential direction of each magnet slot to the outer side of the rotor core. The projecting hole projects in the circumferential direction of the rotor core from at least one of peripheral portions, opposed to each other, of the base holes provided at both of the ends of the magnet slot, when viewed in an axial direction. The projecting hole is located closer to the magnet slot than to an outer peripheral side end of the base hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA
OSAKA PREFECTURE UNIVERSITY PUBLIC CORPORATIONOSAKA 599-8531

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Yukinori Osaka, JP 2 2
Kondou, Toshinari Osaka, JP 9 95
Morimoto, Shigeo Osaka, JP 63 872
Sanada, Masayuki Osaka, JP 10 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00