Circuit design instrumentation for state visualization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9798842
SERIAL NO

14611031

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit may include observable storage circuits and unobservable or non-observable storage circuits. Among values stored in the observable and the non-observable storage circuits, only the values stored in the observable storage circuits are accessible for read-back and/or write-back operations during hardware emulation. A computer system may receive a circuit design that includes a design-under-test and implement at least a portion of the circuit design in the integrated circuit. The computer system may insert observable storage circuits into the circuit design and couple the observable storage circuits to the non-observable storage circuits such that the data stored in the non-observable storage circuits may be accessed during read-back operations using the inserted observable storage circuits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTERA CORPORATION101 INNOVATION DRIVE SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hutton, Michael Mountain View, US 24 329

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00