Switchable directional infrared radiation source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9798218
APP PUB NO 20150293428A1
SERIAL NO

14648231

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A source of directional radiation in an IR band comprises at least a substrate and an external layer comprising controllable cells made of a metal insulator transition material that changes phase depending on its temperature relative to a temperature at which the corresponding wavelength is located in the IR band and that possesses a crystalline phase and an amorphous phase, and control means for controlling the phase change of the cells so as to form in this external layer a diffraction grating when the cells are controlled to the amorphous phase, in order thus to obtain a switchable directional source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUEPARIS FRA
UNIVERSITE PARIS SUD15 RUE GEORGES CLEMENCEAU ORSAY 91405
INSTITUT D'OPTIQUE GRADUATE SCHOOLCAMPUS POLYTECHNIQUE RD 128 PALAISEAU F-91127

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben-Abdallah, Philippe Vieille Eglise en Yvelines, FR 2 8
Benisty, Henri Palaiseau, FR 17 276
Besbes, Mondher Les Ulis, FR 2 8
Coutrot, Anne-Lise Paris, FR 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00