Method for constructing universal LED bulb and flange snap ring type LED bulb and LED lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797590
SERIAL NO

14416768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for constructing a universal LED bulb, a flange snap ring type LED bulb and a lamp. A heat conductive bracket (3) is used as the structure supporting main body to establish an optical engine core member. A thin-shelled lens snap ring (8) is used to support the optical engine core member in an auxiliary manner. An installation flange hole is provided to the lens snap ring (8), correspondingly to an installation flange hole of the heat conductive bracket (3), to surround and protect the heat conductive bracket (3). The optical engine core member is composed of the heat conductive bracket (3), an optical engine module (4), an inner snap ring (81) and a light distribution optical lens (7). An inner cover (6) is provided outside the optical engine module (4). An electric connector (11) is provided to the heat conductive bracket (3).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUIZHOU GZGPS CO LTDHONGTAISHIJIA28D SHINAN ROAD NANMING GUIYANG GUIZHOU 550002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Jiqiang Guizhou, CN 12 130
Zhang, Zheyuan Guizhou, CN 18 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00