Headlight

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797569
SERIAL NO

14969863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A headlight, especially a motor vehicle headlight, comprises a bushing (1) with a translucent cover (2) forming an inner chamber (3) including a light source (4), an optical system (5) for guiding the light beam from the light source, a cooling body having the light source mounted thereon and fitted with cooling elements (61) to extract heat from the heat source, and a cooling channel (7) for passage of the cooling media for heat extraction from the cooling elements. The cooling channel is closed with respect to the chamber to prevent the cooling media from passing through the chamber outside the cooling channel The body forms the wall of a part of the cooling channel, and the cooling elements face the inner space of the cooling channel. The part of the cooling channel whose wall comprises the cooling body is arranged in a controlled movable way in the inner chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PO LIGHTING CZECH S R OSUVOROVOVA 195 SENOV U NOVEHO JICINA 742 42

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grof, Jan Koprivnice, CZ 4 15
Hasa, Ondrej Ratibor, CZ 4 15
Klimicek, Stanislav Fulnek, CZ 3 7
Kratochvil, Jan Horka-Domky, CZ 14 41
Macicek, Milos Senov u Noveho Jicina, CZ 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00