Connection between two components made of reinforced plastic and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797428
SERIAL NO

13500253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a connection comprising at least two components having the following features: a first component and a second component, of which at least the second component comprises reinforced plastic, a self-piercing connection element (30) having a head and a shaft, the head thereof being supported on the first component and the shaft thereof running completely through the first and the second component, and a disc-shaped counter bearing to which the shaft is fastened such that the at least two components are fastened between the head and the counter bearing. The invention further relates to a method for the production of said connection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOLLHOFF VERBINDUNGSTECHNIK GMBH1-4 ARCHIMEDES STREET BIELEFELD GERMANY BIELEFELD NORTH RHINE-WESTPHALIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bär, Carsten Ingolstadt, DE 7 22
Draht, Torsten Schloss Holte, DE 32 268
Rintelmann, Jochen Dessau-Rosslau, DE 14 83
Steinig, Marc Altenbeken, DE 3 12
Stumpf, Michael Bielefeld, DE 29 259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00