Connecting member for column and connection structure of column

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797125
APP PUB NO 20160090729A1
SERIAL NO

14864454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cutout part is formed at the approximate center of the connecting member. The cutout part in the connecting member is a circular penetrating hole that penetrates a convex part and a main body part. On the side of a lower surface of the connecting member, the convex part is formed around the cutout part. The convex part includes a tapered part and a rib. The tapered part gradually inclines in the direction toward the center from the side of the main body part (the side of the base part of the convex part) to the tip side (the side of the top part thereof). The rib part is formed on the edge part of the cutout part, which is the top part of the tapered part. The rib part is a part that protrudes downward from the top part of the tapered part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENQCIA CORPORATION4-2 TOYO 2-CHOME KOTO-KU TOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuda, Kumiko Matsudo, JP 9 98
Takahashi, Hideaki Tokyo, JP 952 6442
Tanaka, Hidenori Funabashi, JP 119 556

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00