Method for producing water absorbent resin

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796820
APP PUB NO 20140107293A1
SERIAL NO

14136339

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is a method for producing a water absorbent resin which method is a method for producing surface cross-linked water absorbent resin particles, the method including the successive steps of: (a) adding a surface cross-linking agent and water to a particulate water absorbent resin in a mixer; and (b) reacting the resulting water absorbent resin mixture taken out from the mixer with the surface cross-linking agent in a reactor by heating or active energy ray irradiation, water vapor being used as part or all of the water added in the mixer. This makes it possible to provide a method for producing a water absorbent resin in which method a surface cross-linked water absorbent resin that has excellent properties can be obtained efficiently at low cost with high productivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON SHOKUBAI CO LTD1-1 KORAIBASHI 4-CHOME CHUO-KU OSAKA-SHI OSAKA 541-0043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kadonaga, Kenji Himeji, JP 33 766
Kato, Seiji Himeji, JP 96 1243
Sasabe, Masazumi Himeji, JP 24 331
Tada, Kenji Himeji, JP 29 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00