Process for producing wet masterbatch, and wet masterbatch produced by said process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796819
SERIAL NO

15309027

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a process for producing a wet masterbatch which, without deteriorating a reinforcing property of a rubber composition and rubber physical properties, micronizes a filler slurry by controlling an amount of functional groups on a filler surface, and improves filler dispersibility in the rubber wet masterbatch and the rubber composition. The process for producing a wet masterbatch comprises: a step of producing a slurry solution having a pH of 8 or more by dispersing carbon black having an average amount of surface acidic functional groups (μeq/m2) of 0.15 or more and less than 3.00; a step of producing a mixture by mixing the slurry solution and a rubber latex solution in a liquid phase; and a step of drying the mixture.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIDGESTONE CORPORATIONTOKYO 104-8340

International Classification(s)

loading....
  • 2015 Application Filing Year
  • C08J Class
  • 2246 Applications Filed
  • 1523 Patents Issued To-Date
  • 67.81 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20152016201720182019202020212022202320240255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanda, Yukari Tokyo, JP 2 5
Nishiura, Fumiteru Tokyo, JP 4 14
Someno, Kazuaki Tokyo, JP 6 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 2 Citation Count
  • C08J Class
  • 34.68 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges24941740911101 - 1011 - 2021 - 3041 - 5061 - 70100 +0255075100125150175200225250275300325350375400425450

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029