Lift arrangement of a lift truck with mast damping devices and lift truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796570
SERIAL NO

14636692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lift arrangement of a lift truck, especially a forklift truck, has a lift mast defining a z-axis. The lift mast includes a first mast section and a second mast section. Damping elements made from elastic material are provided on the first mast section and/or the second mast section preventing a hard impact of the second mast section with the first mast section at the run-in end position of the second mast section. The damping elements are configured and arranged in such a manner that, in addition to damping the movement of the second mast section in the direction of the z-axis, the damping elements damp movements of the second mast section in the directions of the x-axis and the y-axis running perpendicularly to the z-axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JUNGHEINRICH AKTIENGESELLSCHAFTFRIEDRICH-EBERT-DAMM 129 HAMBURG 22047

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Kelvin Jersey Village, US 130 2636
Recchia, John Detroit, US 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00