Carrier with lowered platform height

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796318
SERIAL NO

14818760

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tow truck carrier with sub frame rails above the carrier chassis frame rails that also reduces platform height thereby presenting a lower center of gravity. Sub frame rails of rectangular steel tubing with the wider dimension of the tubing are used in a horizontal, low profile orientation, with the direct attachment of the lift cylinder ends to the sub frame rails or to a cross beam to lower the platform. The sub frame rails form a descending ladder frame with cross members attached via brackets so that they are lowered into the recess between the chassis side frame. A lifting bracket is welded to the underside of each sub frame rail underneath the overhang and adjacent to the chassis frame to accept the end of a lifting cylinder rod while leaving some space for sliding engagement of a platform beam which engages three edges of the sub frame rail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOLASCO PABLO35-30 104 ST CORONA NY 11368
LAGANAS STEVEN2929 SHORE DRIVE MERRICK NY 11566

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nolasco, Pablo Corona, US 9 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00