System and method for cooling electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796292
SERIAL NO

14826906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for cooling a vehicle including a power conversion component, a motor, a radiator, an electronic water pump, and a cooling unit cooling the power conversion component includes: an air conditioning unit configured to interlock with the cooling unit to perform air conditioning of the vehicle; a temperature sensor configured to sense a temperature of air in the air conditioning unit; a cooling water temperature sensor configured to sense a temperature of cooling water flowing in the cooling unit; and a cooling control controller configured to calculate a targeted air flow rate and a targeted cooling water flow rate to control the cooling of the cooling unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATIONSEOUL 137-938
HYUNDAI MOTOR COMPANYSEOUL
DONG-A UNIVERSITY RESEARCH FOUNDATION FOR INDUSTRY-ACADEMY COOPERATIONSAHA-GU BUSAN 604-714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chung, Tae Young Gyeonggi-Do, KR 58 333
Jung, Tae Hee Gyeonggi-Do, KR 9 45
Lee, Moo Yeon Busan, KR 3 26
Seo, Jae Hyeong Busan, KR 19 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00