Ceramic composite material consisting of aluminium oxide and zirconium oxide as main constitutents

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9795709
SERIAL NO

13515405

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite material having a first phase includes an aluminum oxide proportion of at least 65% by volume and a second phase comprising a zirconium proportion of 10 to 35% by volume. The zirconium is present as zirconium oxide. The aluminum oxide is a ceramic matrix and the zirconium oxide is dispersed therein. From 90 to 99% of the zirconium oxide is present in the tetragonal phase. A chemical stabilizer for stabilizing the tetragonal phase of the zirconium oxide is also present. The total content of chemical stabilizer is <0.2 mol % relative to the zirconium oxide content.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CERAMTEC GMBHCERAMTEC-PLATZ 1-9 PLOCHINGEN 73207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Friederich, Kilian Plochingen, DE 17 70
Gottwik, Lukas Heiningen, DE 7 16
Kuntz, Meinhard Esslingen, DE 13 32
Kuntz, Michael Homburg, DE 13 89
Morhardt, Andreas Esslingen, DE 4 16
Schilcher, Kristina Esslingen, DE 1 3
Schneider, Norbet Schorndorf, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00