Control of an engine-driven generator to address transients of an electrical power grid connected thereto

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793842
SERIAL NO

14549264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A technique for providing electric power to an electric power utility grid includes driving an electric power alternator coupled to the grid with a spark-ignited or direct injection internal combustion engine; detecting a change in electrical loading of the alternator; in response to the change, adjusting parameters of the engine and/or generator to adjust power provided by the engine. In one further forms of this technique, the adjusting of parameters for the engine includes retarding spark timing and/or interrupting the spark ignition; reducing or retarding direct injection timing or fuel amount and/or interrupting the direct injection; and/or the adjusting of parameters for the generator including increasing the field of the alternator or adding an electrical load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS POWER GENERATION IP INC1400 73RD AVENUE NE MINNEAPOLIS MN 55432

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitchen, Andrew Daventry, GB 8 64
Palmer, Bradford K Ham Lake, US 25 283
Pendray, John R Blaine, US 29 283
Pierz, Patrick M Columbus, US 19 825

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00