Vibration power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793828
SERIAL NO

14411798

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Power generated by a vibration power generator using an electret is efficiently supplied to a power supply load. A vibration power generator includes a first substrate and a second substrate configured to be moved relative to each other by external vibration while remaining opposite each other, a group of a plurality of electrets arranged in the relative movement direction on one surface side of the first substrate, and a group of a plurality of electrodes arranged in the relative movement direction on a surface side of the second substrate opposite to the group of electrets, the group of electrodes including first current collecting electrodes and second current collecting electrodes electrically connected to respective power supply loads to which power generated by the external vibration is supplied, and ground electrodes each provided between the first current collecting electrode and the second current collecting electrode and grounded.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATIONKYOTO JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masaki, Tatsuakira Kyoto, JP 10 33
Matsuura, Keiki Nara, JP 14 37
Nabeto, Misato Nara, JP 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00