Method for improving small disturbance stability after double-fed unit gets access to the system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793713
SERIAL NO

14649532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for improving system small disturbance stability after double-fed unit gets access to the system belongs to the field of electric power system operation and control technology. A sensitivity analysis is adopted to optimize parameter, through making sensitivity analysis on the non-ideal dominant mode happens to the system to find out several nonzero elements that are most sensitive to this mode in system matrix; elements of state matrix is adopted to replace the elements of system matrix to make analysis so as to find out the most relevant parameter set; setting parameters change in the interval to observe track for the change of eigenvalues of corresponding mode and then balancing and optimizing system parameters comprehensively according to the change of eigenvalues. Without adding other control means, the present invention can improve dominant modal damping caused by selecting improper controller parameters or system parameters after double-fed unit gets access to the system without increasing cost; as this method is also highly targeted, exhaustive efforts for all the adjustable parameters of the system can be avoided, which not only greatly decreases workload, but also improves computational efficiency, so that it is very instructive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GANSU ELECTRIC POWER CORPORATION WIND POWER TECHNOLOGY CENTERNO 475 XIJIN EAST ROAD QILIHE DISTRICT LANZHOU GANSU PROVINCE 730050

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Kun Lanzhou, CN 22 48
Ding, Yi Lanzhou, CN 333 2067
Jin, Dan Lanzhou, CN 12 11
Li, Jin Lanzhou, CN 561 11650
Liu, Chongru Lanzhou, CN 2 0
Liu, Wenying Lanzhou, CN 13 7
Liu, Zhongyi Lanzhou, CN 62 580
Ma, Yanhong Lanzhou, CN 15 31
Wang, Dan Lanzhou, CN 314 948
Wang, Ningbo Lanzhou, CN 13 31
Zhao, Long Lanzhou, CN 81 123
Zhou, Qiang Lanzhou, CN 211 655
Zhou, Shiyuan Lanzhou, CN 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00