Power supply transient performance (power integrity) for a probe card assembly in an integrated circuit test environment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793226
APP PUB NO 20170250146A1
SERIAL NO

15055089

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention describes essentially three different embodiments for the implementation of low impedance (over frequency) power delivery to a die. Such low impedance to a high frequency allows the die to operate at package-level speed, thus reducing yield loss at the packaging level. Each embodiment addresses a slightly different aspect of the overall wafer probe application. In each embodiment, however, the critical improvement of this disclosure is the location of the passive components used for supply filtering/decoupling relative to prior art. All three embodiments require a method to embed the passive components in close proximity to the pitch translation substrate or physically in the pitch translation substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • R & D CIRCUITS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Russell, James V New Hope, US 29 116
Turpuseema, Dhananjaya Whitehouse Station, US 4 4
Warwick, Thomas P Melbourne, US 15 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00