Method and system for providing magnetic junctions with rare earth-transition metal layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9792971
APP PUB NO 20160005449A1
SERIAL NO

14730379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnetic junction usable in magnetic devices is described. The magnetic junction includes a reference layer, a free layer, a nonmagnetic spacer layer between the reference and free layers, and a rare earth-transition metal (RE-TM) layer in the reference and/or free layers. The free layer is switchable between stable magnetic states when a write current is passed through the magnetic junction. If the RE-TM layer is in the free layer then the RE-TM layer is between hard and soft magnetic layers in the free layer. In this aspect, the RE-TM layer has a standby magnetic moment greater than a write magnetic moment. If the RE-TM layer is in the reference layer, then the magnetic junction includes a second RE-TM layer. In this aspect, a first saturation magnetization quantity of the RE-TM layer matches a second saturation magnetization quantity of the second RE-TM layer over an operating temperature range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Apalkov, Dmytro San Jose, US 90 2016
Carey, Matthew J San Jose, US 41 815
Chan, Keith San Jose, US 37 332

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00