Flow control device equipped with flow monitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791867
APP PUB NO 20160282880A1
SERIAL NO

14778398

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow control device equipped with flow monitor includes a build-down type flow monitor unit provided on an upstream side, a flow control unit provided on a downstream side of the build-down type flow monitor unit, a signal transmission circuit connecting the build-down type flow monitor unit and the flow control unit and transmitting a monitored flow rate of the build-down type flow monitor unit to the flow control unit, and a set flow rate value adjustment mechanism being provided in the flow control unit and adjusting a set flow rate of the flow control unit based on the monitored flow rate from the build-down type flow monitor unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIKIN INCORPORATED3-2 ITACHIBORI 2-CHOME NISHI-KU OSAKA-SHI OSAKA 5500012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hidaka, Atsushi Osaka, JP 32 428
Ikeda, Nobukazu Osaka, JP 234 4423
Nagase, Masaaki Osaka, JP 88 1119
Nishino, Kouji Osaka, JP 169 2577

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00