Circuit substrate structure and method for manufacturing thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791753
APP PUB NO 20140192491A1
SERIAL NO

14144599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a circuit substrate structure and a method for manufacturing thereof. The circuit substrate structure includes a substrate, a pixel array layer, a display unit, a peripheral circuit layer, at least one integrated circuit chip, a flexible printed circuit board, at least one flattening material layer and a passivation layer. In the circuit substrate structure, the flattening material layer is positioned on the peripheral circuit layer, and possesses at least one opening corresponded to and around the integrated circuit chip. By positioning the flattening material layer, the circuit substrate structure possesses a flat surface, and prevents producing air bubbles, so as to enhance the reliability of the display device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
E INK HOLDINGS INCNO 3 LI SHIN RD 1 SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Ming-Sheng Hsinchu, TW 19 99
Lo, Chen-Lung Hsinchu, TW 2 24
Luan, Ta-Nien Hsinchu, TW 12 40
Sung, Chen-Yuan Hsinchu, TW 3 17
Wu, Chi-Ming Hsinchu, TW 83 474

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00