Determining electric grid topology via a zero crossing technique

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791485
APP PUB NO 20150253367A1
SERIAL NO

14586536

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage
Patent Longevity
Forward Citations

Abstract

See full text

A node within a wireless mesh network is configured to record a zero crossing of alternating current or alternating voltage drawn by a single-phase power consumer and a precise timestamp when the zero crossing occurred, thereby generating timestamped zero crossing data. The node receives similar zero crossing data from a neighboring node. The node then compares the timestamped zero crossing data with the received zero crossing data to determine whether the phase associated with the node is equivalent to, leads, or lags the phase associated with the neighboring node. The node then acquires a positive phase identification associated with the neighboring node. Based on the phase identification, and based on the phase difference between the two nodes, the node infers the phase associated with the single-phase power consumer. That phase indicates the specific power line within a three-phase power distribution network to which the single-phase power consumer is coupled.

First Claim

See full text

Other Claims data not available

Family

Patent Owner(s)

  • ITRON NETWORKED SOLUTIONS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Flammer,, III George H Cupertino, US 28 223
Sum, Charles P Cupertino, US 9 245

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 2 Citation Count
  • H02J Class
  • 20.50 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges1143555715113101 - 1011 - 2021 - 3031 - 4041 - 5051 - 600100200300255075125150175225250275325350375

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029