Firearm handgrip assembly with laser gunsight system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791240
SERIAL NO

15265458

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A firearm handgrip assembly with laser gunsight system has a frame, the frame having an attachment facility adapted for secure connection to a firearm, the frame having a connection facility associated with an optical passage, an elongated beam projection element having a first end connected to the connection facility, and an opposed second end, the beam projection element operable to emit a beam from the first end, and the frame including an aiming facility operable to adjust the position of the second end of the beam projection element while the first end remains connected to the connection facility. The first end of the beam projection element may be pivotally connected to the connection facility. The beam projection element and the connection facility may be connected by a ball and socket joint. The first end of the beam projection element may include a spherical surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOGUE INCPO BOX 91360 HENDERSON NV 89009

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruhns, James David Templeton, US 15 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00