High temperature field joints

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791091
SERIAL NO

14954545

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a high temperature field joint between two insulated pipe sections, and an insulated conduit having a low temperature field joint. The conduit comprises a steel pipe with a corrosion protection coating and a pipe insulation layer comprising a polymer composition having thermal conductivity of less than about 0.40 W/mk, and/or heat resistance to continuous operating temperatures from about 150° C. to above about 205° C. After a circumferential weld joint is formed between the two pipes, a first field joint insulation layer is applied over the joint area, the first field joint insulation layer comprises a polymer composition having heat resistance to continuous operating temperatures from about 150° C. to above about 205° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHAWCOR LTD25 BETHRIDGE ROAD REXDALE ON M9W 1M7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choudhary, Suresh Houston, US 5 16
Hegdal, Jan Peder Fannrem, NO 5 53
Sletvold, Torgeir Orkanger, NO 5 14
Wan, Eileen Richmond Hill, CA 10 137
Yodogawa, Masahide Chadds Ford, US 19 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00