DLC-coated gate valve in petroleum production or water injection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791051
SERIAL NO

14380481

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a gate valve (1) for control of petroleum production or water injection, distinctive in that at least one surface subject to sliding in operation of the valve comprises a top layer coating of diamond like carbon (DLC). The DLC contains hydrogen, preferably more than 16 atom-% and more preferred more than 17 atom-%. It is further directed to a method of commissioning or operating a gate valve according to the invention, and use of a diamond like carbon (DLC) top layer coating on at least one surface subject to sliding in operation of the gate valve. Valve parts have a tendency of sticking, adhering or cold welding together, which result in high friction. The aim of the invention is to reduce or eliminate friction problems occurring with time or operation cycles, when using a full scale gate valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKER SOLUTIONS ASP O BOX 94 LYSAKER 1325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haldorsen, Henrik Dishington Oslo, NO 2 2
Twist, Dag Drammen, NO 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00