Control device for common rail fuel injection device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790908
SERIAL NO

14894700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A common rail fuel injection device includes first and second flow rate regulating valves for regulating a delivery volume of a pressurized fuel feed pump that feeds pressurized fuel to a common rail, a pressure reducing valve for reducing a common rail pressure, and a control device. The control device for the common rail fuel injection device includes a first drive controlling unit that controls a first electromagnetic driving unit for the second flow rate regulating valve and a second electromagnetic driving unit for the pressure reducing valve, and a second drive controlling unit that controls a third electromagnetic driving unit for the first flow rate regulating valve. The first drive controlling unit prohibits a drive instruction from being sent to the second flow rate regulating valve when the first drive controlling unit sends a drive instruction to the pressure reducing valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ISUZU MOTORS LIMITED2-5 TAKASHIMA 1-CHOME NISHI-KU YOKOHAMA-SHI KANAGAWA 220-8720

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagasaki, Takahiro Fujisawa, JP 1 1
Narita, Kazuyoshi Yokohama, JP 3 31
Suzuki, Kenta Atsugi, JP 124 255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00