Systems and methods for producing gas wells with multiple production tubing strings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790773
SERIAL NO

14339236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for producing hydrocarbons from a subterranean well including a wellbore extending from a surface into a subterranean formation, the system including a wellhead disposed at the surface. In addition, the system includes a production tree coupled to the wellhead. Further, the system includes a casing coupled to the wellhead and extending into the wellbore. Still further, the system includes a first plurality of production tubing strings extending into the casing from the wellhead to a first production zone. Each of the first plurality of production tubing strings is configured to provide a fluid flow path for gases from the first production zone. The production tree is configured to selectively and independently control fluid flow through each of the first plurality of production tubing strings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP CORPORATION NORTH AMERICA INCHOUSTON TX 77079

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aman, Michael Elgie Edmond, US 2 5
Edwards, Paul A Bayfield, US 22 455
Idstein, Timothy Houston, US 3 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00