Pre-fabricated construction panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790682
APP PUB NO 20160230385A1
SERIAL NO

15022329

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pre-fabricated construction panel for use on an external surface and/or as part of a budding or construction is provided. The panel comprises at least a first layer which is at least partially provided from thermally insulating material having a first surface, the panel comprising at least a second layer, the at least second layer being provided from fiber cement board, the second layer having a second surface facing the first surface. The first surface is profiled having recessed surface zones and heightened surface zones, the first and second layers being connected one to the other at least along the heightened surface zones of the first, the recessed surface zones provides at least one interspace between the first and second surface. This at least one inter-space has at least two openings to the external of the panel for enabling air to flow into and out of the interspace towards the external of the panel. Less than 25% of the total surface of the first surface is connected to, e.g. adheres to, the second surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ETEX SERVICES NV1880 KAPELLE-OP-DEN-BOS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
O'Neill, Bobby Glenmore, IE 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00