Double flow control mechanism of a soft touch drain valve and a double flow control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790675
SERIAL NO

14945044

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A double flow control mechanism of a soft touch drain valve and a double flow control method, includes a base, a float component and a starting component. The base is assembled with a valve body. The float component is has a flowing passage and can move relative to the base to open and close the drainage opening. The flowing passage connects the inside and the outside of the float chamber of the float component. The starting component controls the size of the flowing passage. The first starting switch can open a smaller flowing passage of the float component; the resultant force drains a first drainage volume of water. The second starting switch can open a larger flowing passage of the float component; the resultant force drains a second drainage volume of water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIAMEN R&T PLUMBING TECHNOLOGY CO LTDNO 18 HOUXIANG ROAD HAICANG DISTRICT XIAMEN CITY FUJIAN PROVINCE 361026 XIAMEN CITY FUJIAN PROVINCE 361026

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Haibin Xiamen, CN 96 1781
Chen, Ruiliang Xiamen, CN 3 3
Zhang, Rongyu Xiamen, CN 8 7
Zhong, Zhijun Xiamen, CN 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00