Shovel having an engine equipped with a supercharger
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Oct 17, 2017
Issued Date -
N/A
app pub date -
Aug 28, 2014
filing date -
Sep 5, 2013
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A shovel includes a boom cylinder that drives a boom and an arm cylinder that drives an arm. A hydraulic pump supplies operating oil to the boom cylinder and the arm cylinder. An engine is connected to the hydraulic pump and equipped with a supercharger. The engine is controlled to maintain a revolution speed within a certain definite range. A controller controls a rotating speed of the supercharger. The controller performs a process of increasing the rotating speed of the supercharger so as to increase a supercharging pressure generated by the supercharger before a hydraulic load is applied to the engine.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SUMITOMO(S H I ) CONSTRUCTION MACHINERY CO LTD | JAPAN |
International Classification(s)

- 2014 Application Filing Year
- F02B Class
- 1127 Applications Filed
- 980 Patents Issued To-Date
- 86.96 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Morita, Kenji | Chiba, JP | 168 | 2753 |
# of filed Patents : 168 Total Citations : 2753 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- F02B Class
- 21.92 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 17, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 17, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
