Hydraulic shovel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790659
APP PUB NO 20160024749A1
SERIAL NO

14775256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a hydraulic shovel capable of moving a boom, an arm, and a bucket at respective adequate speeds even during complex operations thereof, without a significant pressure loss. This hydraulic shovel includes: a first pump (31) connected to a boom actuator (24) and a bucket actuator (28); a second pump (32) connected to an arm actuator (26) and the boom actuator (24); a third pump (33) connect to the arm actuator (26); a boom control valve (54) interposed between the first pump (31) and the boom actuator (24); an arm control valve (56) interposed between the second pump (32) and the arm actuator (26); a bucket control valve (58) interposed between the first pump (31) and the bucket actuator (28); a boom merging valve (55) for speed increase interposed between the second pump (32) and the boom actuator (24); and an arm merging valve (57) for speed increase interposed between the third pump (33) and the arm actuator (26).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL LTD )2-4 WAKINOHAMA-KAIGANDORI 2-CHOME CHUO-KU KOBE-SHI HYOGO 6518585 ?6518585
KOBELCO CONSTRUCTION MACHINERY CO LTDHIROSHIMA COUNTY HIROSHIMA JAPAN HIROSHIMA-SHI HIROSHIMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maekawa, Satoshi Hiroshima, JP 46 363
Nanjo, Takao Kobe, JP 10 98
Oguma, Shota Kobe, JP 4 15
Sugano, Naoki Kobe, JP 35 270
Ueda, Koji Hiroshima, JP 191 1495

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00