Proppant mixtures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790422
APP PUB NO 20150315892A1
SERIAL NO

14266179

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a propped, fractured, subterranean field with (a) a first proppant and (b) a second proppant that exhibits a relatively higher average crush strength and/or an ability to form a particle to particle bonded structure than the first proppant. Preferably, the first proppant is uncoated sand and the second proppant is resin-coated sand. The proppants can be deposited as a substantially homogeneous mixture or in layered structures (vertical or horizontal) within the fractured field. Deformation of the second proppant under closure stress acts to spread out the compression pressures in a mixture so as to reduce failure of the first proppant. Similar protective effects are found when the proppants are deposited in layers. When formed as vertical pillar structures, the second proppant structures can also act as in-situ screens that inhibit formation fines from migrating through the proppant pack to the detriment of field conductivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JEFFERIES FINANCE LLC520 MADISON AVENUE 16TH FLOOR NEW YORK NY 10022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McDaniel, Robert Ray Cypress, US 35 670

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00