Production process and purification process of 4-hydroxy-benzoic acid long chain ester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790165
APP PUB NO 20160318841A1
SERIAL NO

15130180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a production process of a 4-hydroxy-benzoic acid long chain ester, that includes a step of reacting a 4-hydroxy-benzoic acid short chain ester with an aliphatic alcohol in the presence of a metal catalyst. The present invention also relates to a purification process of a 4-hydroxy-benzoic acid long chain ester, that includes a step of adding an acid aqueous solution to a crude composition including the 4-hydroxy-benzoic acid long chain ester, separating the crude composition to an organic phase and a water phase and extracting the organic phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UENO FINE CHEMICALS INDUSTRY LTD4-8 KORAIBASHI 2-CHOME CHUO-KU OSAKA-SHI OSAKA-FU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hisano, Takaya Takarazuka, JP 4 4
Kita, Yusuke Sanda, JP 10 12
Komatsu, Toshihide Kobe, JP 2 0
Tsuchiya, Mio Sanda, JP 1 0
Yanagawase, Kuniyo Sanda, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00