Power conversion apparatus and power control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789773
APP PUB NO 20150375626A1
SERIAL NO

14844542

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Charge efficiency of normal charge is improved without restricting an operation of a low-voltage load of an electric vehicle during the normal charge. During a charge of a high-voltage battery of a vehicle, when a determination of the normal charge is made, and when a determination that a mode switching target load is not operated is made, power saving mode transition processing is performed. Therefore, an operating mode of a DC-DC converter, which steps down a voltage at the high-voltage battery and supplies the stepped-down voltage to a low-voltage battery and a low-voltage load, is set to a power saving mode in which consumption power is reduced compared with a normal mode. When a determination that a start-up manipulation of the mode switching target load is performed is made, the operating mode of the DC-DC converter is changed to the normal mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATION801 MINAMIFUDODO-CHO HORIKAWAHIGASHIIRU SHIOKOJI-DORI SHIMOGYO-KU KYOTO-SHI KYOTO 600-8530

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hachiya, Koji Kasugai, JP 35 369
Hanatani, Masayuki Kasugai, JP 5 77
Ido, Yusaku Kani, JP 20 306
Omoto, Yasumichi Kasugai, JP 17 192
Tamanaha, Hajime Kasugai, JP 4 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00