Window shade hook assembly, and methods of use and manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789752
APP PUB NO 20170291475A1
SERIAL NO

15096130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some embodiments are directed to a hook assembly for use with a vehicle having a vehicle interior, a vehicle door having a window bordered by a lining, and a sunshade assembly configured to cover the window, the sunshade assembly having a support member by which the sunshade assembly can be secured to the lining to cover the window. The hook assembly can include a grommet configured to be connected to the lining. The hook assembly can also include a hook member configured to be disposed adjacent and attached to the grommet such that the grommet is disposed between the hook member and the lining, the hook member including a hook extending therefrom, the hook being configured to engage the support member to secure the sunshade assembly to the lining to cover the window.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dilley, Jason R Plain City, US 4 0
Sia,, Jr Generoso Tan Plain City, US 6 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00