Method for producing a jig for tubes having bent sections, and resulting jig

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789591
APP PUB NO 20150258664A1
SERIAL NO

14438042

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a jig (M) for the thermal forming and/or inspection of a tube (T) of neutral axis (x) and comprising a bent sections (c1-c3) connected by straight sections (d2-d3). The method consists in producing n individual jigs (M1-M3) each comprising a section of duct (18, 18′) of planar neutral axis (χ) for guiding a tube segment formed by one of the n bent sections of the tube (T) and by a predetermined length of each of the straight sections (d1-d4) extending from said bent section, said predetermined length corresponding to either all or part of the length of the straight section; and assembling the n individual jigs (M1-M3) with the sections of guide duct in the continuation of one another and with a relative orientation of the individual jigs adapted to provide a relative orientation between the n planes defined by the neutral axis (χ) of the n sections of guide duct (18, 18′) that is identical to the relative orientation between the n bending planes (P1, P2, P3) defined by the n bent sections (c1-c3) of the tube (T).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TUBE FIXTUREROUTE DE SARRANT COLOGNE 32430

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jaubert, Philippe Cologne, FR 12 77
Pellat, Regis Colomiers, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00