Methods and apparatus for processing molten materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789545
SERIAL NO

13021978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various non-limiting embodiments disclosed herein relate to nozzle assemblies for conveying molten material, the nozzle assemblies comprising a body, which may be formed from a material having a melting temperature greater than the melting temperature of the molten material to be conveyed, and having a molten material passageway extending therethrough. The molten material passageway comprises an interior surface and a protective layer is adjacent at least a portion of the interior surface of the passageway. The protective layer may comprise a material that is essentially non-reactive with the molten material to be conveyed. Further, the nozzle assemblies according to various non-limiting embodiments disclosed herein may be heated, and may be self-inspecting. Methods and apparatus for conveying molten materials and/or atomizing molten materials using the nozzle assemblies disclosed herein are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATI PROPERTIES INC1600 N E OLD SALEM ROAD ALBANY OR 97321

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kennedy, Richard L Monroe, US 41 644

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00