Method and an apparatus for processing an audio signal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9787266
APP PUB NO 20160205490A1
SERIAL NO

15077765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of processing an audio signal is provided. A decoding apparatus receives the audio signal, which includes a plurality of objects. The decoding apparatus further receives object information, object gain information, and object correlation information, preset presence information, preset number information, preset information based on the preset presence information and the preset number information, and preset rendering data. The preset information exists in a header region or in each frame. The decoding apparatus obtains a preset matrix from the user by an input unit of the audio decoding apparatus when the preset type information indicates the preset rendering data is defined by the user, and adjusts an output level of the plurality of objects for an output channel based on the object information and the preset matrix. The decoding apparatus outputs an adjusted audio signal including the plurality of objects with an adjusted output level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336 07336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Yang Won Seoul, KR 138 1643
Oh, Hyen O Seoul, KR 107 1301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00