Vibration power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9787162
SERIAL NO

14397763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The vibration power generator includes: a plurality of permanent magnets (1, 2) integrated together to have given inter-magnet gaps under a state in which the same poles of the permanent magnets are opposed to each other; and a plurality of coils (3, 4) arranged on respective outer peripheries of the plurality of permanent magnets so as to have a distance from the plurality of permanent magnets, and is configured to generate an electric power through relative movement of the plurality of permanent magnets and the plurality of coils. A relationship between a length of the opposed coils and a length of the permanent magnet is set so that the length of the coils is larger than the length of the permanent magnet and equal to or smaller than a sum of the length of the permanent magnet and a length of the inter-magnet gap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC ENGINEERING COMPANY LIMITED1-13-5 KUDANKITA CHIYODA-KU TOKYO 102-0073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bando, Masataka Tokyo, JP 1 2
Nomura, Hiromori Tokyo, JP 2 31
Onishi, Ken Tokyo, JP 87 1843

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00