Current collector, electrode structure, nonaqueous electrolyte battery and electrical storage device, and method for producing current collector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9786919
SERIAL NO

14399492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Current collector, an electrode structure, a non-aqueous electrolyte battery, and an electrical storage device having superior shut down function are provided. According to the present invention, a current collector having a resin layer on at least one side of a conductive substrate is provided. Here, thermoplastic resin particles substantially free of a conductive agent are dispersed in a thermosetting resin base material containing the conductive agent to structure the resin layer; a value of mass ratio given by (thermoplastic resin particles)/(conductive agent) is 0.3 to 1.5; and a value given by (average thickness of conductive agent)/(average thickness of thermoplastic resin particles) is 0.3 to 4.0.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UACJ CORPORATION1-7-2 OTEMACHI CHIYODA-KU TOKYO 1000004 JAPAN
UACJ FOIL CORPORATION6-5 NIHONBASHI KABUTOCHO CHUO-KU TOKYO 1030026

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honkawa, Yukiou Chiyoda-ku, JP 22 140
Kataoka, Tsugio Kusatsu, JP 17 127
Kato, Osamu Chiyoda-ku, JP 224 2631
Saito, Sohei Chiyoda-ku, JP 23 143
Wasamoto, Mitsuyuki Kusatsu, JP 11 28
Yamabe, Satoshi Kusatsu, JP 18 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00