Reactor and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9786433
APP PUB NO 20150357110A1
SERIAL NO

14831210

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

First and second divisional cores each including right and left leg portions and a yoke interconnecting those together are formed by molding respective yoke-side core members in a resin. Cylindrical core mounting portions extending from the outer circumference of the surface of the yoke-side core member are formed integrally with the respective right and left leg portions of the first divisional core. I-shaped leg-portion-side core members and spacers are attached in the cylindrical core mounting portion formed in each of the right and left leg portions. The surface of the yoke-side core member molded in the resin and the surface of the leg-portion-side core member are disposed so as to have a spacer therebetween. The two divisional cores are joined together by butting respective leg portions of the two divisional cores with each other to form an annular mold core, and a coil is wound around the mold core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAMURA CORPORATION1-19-43 HIGASHI-OIZUMI NERIMA-KU TOKYO 1788511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maeno, Kensuke Sakado, JP 23 205
Nakatsu, Ryo Sakado, JP 19 189
Suzuki, Kotaro Sakado, JP 42 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00