Component arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9786426
APP PUB NO 20160141092A1
SERIAL NO

14899862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments may relate to a component arrangement, including a carrier, wherein at least one electronic component is formed in the carrier, a first metallization layer over the carrier, wherein the first metallization layer has a first metallic coupling structure, which is electrically coupled to the at least one electronic component, a second metallization layer over the first metallization layer, wherein the second metallization layer has a second metallic coupling structure, wherein the first metallic coupling structure is coupled to the second metallic coupling structure by means of at least one via, and a plurality of additional vias, which extend at least between the first metallization layer and the second metallization layer and are electrically conductively coupled to one another in such a way that they form a coil, which has a coil region which is at an angle to the main processing surface of the carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNISCHE UNIVERSITAT DRESDENDRESDEN DRESDEN FREE STATE OF SAXONY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belfiore, Guido Dresden, DE 1 4
Ellinger, Frank Dresden, DE 1 4
Henker, Ronny Dresden, DE 1 4
Thiele, Christian Dresden, DE 6 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00