Bulkhead assembly having a pivotable electric contact component and integrated ground apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9784549
APP PUB NO 20160273902A1
SERIAL NO

15068786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an aspect a bulkhead assembly is provided having particular application with a downhole tool, in particular for oil well drilling applications. The bulkhead assembly includes a bulkhead body and an electrical contact component disposed within the bulkhead body, wherein at least a portion of the electrical contact component is configured to pivot about its own axis, without compromising its ability to provide a pressure and fluid barrier. In an embodiment, a ground apparatus is provided to provide an electrical connection for at least one ground wire. The ground apparatus may be positionable on the bulkhead body of the bulkhead assembly. In an aspect, a downhole tool including the bulkhead assembly and ground apparatus is also generally described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYNAENERGETICS EUROPE GMBHKAISERSTRASSE 3 TROISDORF 53840

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eitschberger, Christian München, DE 124 2021

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00