Fault tolerant control system for distributed micro-thrusters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9784251
SERIAL NO

14001890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for controlling the operation of a plurality of micro thrusters arranged in a plurality of parallel horizontal rows and a plurality of parallel vertical columns, the control system requires a power source, a first plurality of power lines connected to the power source and coupled to at least one micro thruster of the plurality of micro thrusters in a horizontal row of the plurality of parallel horizontal rows, a second plurality of power lines connected to the power source and coupled to at least one micro thruster of the plurality of micro thrusters in a vertical column of the plurality of parallel vertical columns, and a control unit coupled to the power source to control activation of the first plurality of power lines and activation of the second plurality of power lines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GAME CHANGERS LLC41 EAST 31ST STREET NEW YORK NY 10016

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garbuz, Piotr A New York, US 17 53
Sanchez, Jason D Delmar, US 11 43
Zonenberg, Andrew D Troy, US 11 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00